Start now or wait? 8 weeks until 1 January

Start Now or Wait Until January? What 8 Weeks Can Do

Every year around now the same sentence appears: "I'll start in the new year." It sounds harmless, but it hands away about 8 weeks of training you could be banking today. That is a full strength block, or a full fat loss phase, given up for nothing.

Here are the real numbers, so you can decide for yourself.

Graph of weight lost and back squat added over 8 weeks when you start now versus wait until January

Illustrative. Based on about 1lb a week and an intermediate lifter. Real results vary.

What 8 weeks can do for weight loss

A 500 kcal daily deficit is the classic target, worth about 1lb (0.45kg) a week on paper. Over 8 weeks that is up to 8lb, or around 3.5kg, gone before January even starts.

One honest caveat. The old "3500 calories per pound" rule is a guide, not a promise. In a 2013 review of closely monitored studies, most people lost less than the rule predicted, because your body needs fewer calories as you get lighter, so the loss slows down. Treat 1lb a week as the aim and 5 to 8lb as a realistic result. Either way, that is weight you will not have to find in a cold January.

What 8 weeks can do for your squat

Eight weeks is a proper training block: enough time to build, push and test. How much you add depends on how long you have been lifting, because beginners improve workout to workout, intermediates week to week, and advanced lifters month to month.

Experience Realistic back squat gain in 8 weeks
Beginner (under 1 year) 10kg or more
Intermediate (1 to 3 years) 5 to 10kg
Advanced (3 years or more) 2.5 to 5kg

Treat these as rough ranges, not promises. The point is that a block you skip does not come back. Start in January and those 8 weeks of progress simply never happen.

Start now versus start on 1 January

Start this week Start on 1 January
Weight lost by 1 January 5 to 8lb None, and probably a little gained
Back squat by 1 January Up 5 to 10kg (intermediate) No change
Where you are on 1 January About 8 weeks in, habit built Day 1
Where you are on 1 March About 16 weeks in About 8 weeks in

Waiting does not save you any effort. It only pushes the same work back by 8 weeks.

A simple 8 week plan

You do not need anything fancy. You need a start line, a direction and a finish line.

  1. Weeks 1 and 2: set the baseline. Weigh in, note your current top squat set, and pick your calorie target. Train 2 to 3 times a week.
  2. Weeks 3 to 5: build. Add a little weight or a rep to your main squat sets each week, and keep your protein up.
  3. Weeks 6 and 7: push. Heavier sets, fewer reps, same calorie target.
  4. Week 8: test it. Take an easier week, then hit a new top set and weigh in again.

Solid warm ups matter more as the weights go up, so have a look at our guide on how to warm up for heavy lifting.

Holding the line over Christmas

You will not be perfect on 25 December, and you do not need to be. Enjoy the dinner. Keep the days around it honest, and plan to train at least twice in Christmas week, even if the sessions are short.

The goal is to arrive in January where you planned to be, not to turn the holidays into a boot camp. A few days off will not undo 8 weeks of work. Two months off will.

Questions people ask

When is the best time to start training or a diet?

The best time is the next time you can do it consistently, and for most people that is this week, not 1 January. A plan you start on a Monday in November beats a perfect plan you start in a month's time.

Is it worth starting before Christmas?

Yes. You will arrive in January with the habit built, some progress banked, and a head start on everyone who waited. Christmas week can be a lighter week inside the plan rather than a reason to not begin.

How fast should I try to lose weight?

Around 1lb a week is the usual target, and slower is fine. If you have a health condition or take medication, check with your doctor before starting a calorie deficit.

How much can I add to my back squat in 8 weeks?

It depends on experience. Beginners can add 10kg or more, intermediates around 5 to 10kg, and advanced lifters 2.5 to 5kg. See the table above for the full picture.

Start this week

Pick one number, your bodyweight or your back squat, and write it down today. In 8 weeks you will either have moved it, or you will still be waiting to start.

If sore or taped up thumbs are holding your lifts back, our BWL x CJC GAINS thumb tape stays on through heavy sets, and our guide to hook grip for beginners will help you get a better hold on the bar.

This is general training advice, not medical advice. If you have a health condition, pain or an injury, speak to a doctor or qualified professional first.

Be Strong, Make Gains.
CJC GAINS


On us: grab these free

Starter Gains Program: a simple introduction to training, nutrition and making progress. 6 weeks, on us.

Free Nutrition Guides: 7 downloadable PDFs covering meal planning, eating out, meal prep, takeaways, substitutions, shopping and alcohol.

Explore all programs

Back to blog